Shoal Point Waters Stage 3A

Scope Vassallo Construction was the Principal Contractor for the latest stage of Shoal Point Waters.  This includes delivery of the cul-de-sac development of 19 allotments including footpaths, all underground services, specialised threshold construction of including stone tile placement.  All services, bulk earthworks and landscaping was completed by Vassallo Construction which ensured a smooth construction project.  […]

Woodlands District Park

Scope – Demolition and replacement of stormwater headwall involving a new customised stormwater headwall with custom bends of steel. – Installation of 3 x footbridges, 1 x viewing platform and 2 picnic shelters. – Undertake the entire project within the 4-month programme during the wet season. – Excavate and trim open channel for 6,000 wetland plantings. […]

Kerrisdale Estate Land Stage Three

Works for this 39 lot residential sub-division included the excavation, ground preparation, stormwater and subsoil drainage (incl. stormwater management controls), water and sewage reticulation (including installation of sewer pump station and rising main), roadworks, trenching and conduit laying. All necessary associated civil works for the construction of the residential subdivision know as Kerrisdale Stage 3 […]

Woodlands Estate Andergrove

Vassallo Constructions was awarded the contract to carry out subdivisional works for Stage 7 and 8 of Woodlands Estate. The project required the construction of 62 new allotments in the Estate. Works include Clearing and grubbing, installation of sewer, stormwater, water, electrical, NBN services, asphalt sealing, line marking and road furniture. In addition to allotment […]

Mandalay Road Estate

This steep site required extensive retaining structures to enable the reconstruction of a road and associated drainage to a group of title project at Airlie Beach. The owners were careful to ensure that the engineering and construction methods employed were of the highest standards and a high quality finish was expected. The work involved the […]

Production Park Industrial Estate

Production Park is a 19 Lot Industrial Lot subdivision in the heart of the industrial area in Mackay, Paget. This project comprised of drainage, general earthworks, structures and protective treatments, landscaping and revegetation works. A high level of Environmental Management was required on this project. We experienced high rainfall throughout construction, however delivered the project  […]

Industroplex Industrial Estate

Consisting of 13 industrial lots covering twenty five hectares this development also included the construction of an intersection to the Bruce Highway. The subdivision included 6 meter deep sewer construction, most drainage consisting of culverts including a number of gross pollutant traps, construction of shotcrete and retaining wall drainage swales and an extension to a […]

Galbraith Park Estate Land Development

Galbraith Park is a multi-staged residential subdivision located in Airlie Beach. The developer demands a high-quality finish for this sought-after residential estate and Vassallo Constructions have been contracted to complete three stages of the estate over several years. The most recent stage 5C, completed in 2019, included earthworks, roadworks, kerb and channel, footpaths and turfing […]

Richmond Hills Estate Land Development

Construction of Richmond Hills Estate included operational works for the first three stages. This included the installation of a sewerage pump station, box culverts, major trunk drainage, roadworks and kerbing. The estate also features a spectacular park area that includes the surrounding McCreedy’s Creek. Due to the natural landscape of the estate, benching and retaining […]

Shoal Point Waters Land Development

As a fully master-planned community which offers prestige living, Shoal Point Waters is a high end residential development. Incorporating a manmade lake, park, landscaped buffer zones and impressive entry statement. Vassallo Constructions directly undertook construction of these areas whilst delivering stages 1 & 2 of the development incorporating 73 lots. Infrastructure upgrades included a new […]