Consisting of 13 industrial lots covering twenty five hectares this development also included the construction of an intersection to the Bruce Highway. The subdivision included 6 meter deep sewer construction, most drainage consisting of culverts including a number of gross pollutant traps, construction of shotcrete and retaining wall drainage swales and an extension to a […]