Works for this 39 lot residential sub-division included the excavation, ground preparation, stormwater and subsoil drainage (incl. stormwater management controls), water and sewage reticulation (including installation of sewer pump station and rising main), roadworks, trenching and conduit laying. All necessary associated civil works for the construction of the residential subdivision know as Kerrisdale Stage 3 […]