Raw Water Pipeline Project

The Raw Water Pipelines Relocation project was a part of the federally funded Mackay Ring Road Project. The project entailed relocating two water mains to new service corridors prior to works commencing on the Mackay Ring Road project. Vassallo Constructions commenced work in March 2017 and completed the project in September 2017. Image Gallery

Southbound Overtaking Lanes nr. Thomsetts Rd

Construction of an overtaking lane including drainage, earthworks, unbound and plant mixed stabilised pavement, sprayed bitumen surfacing, road furniture and pavement marking. Image Gallery

Caneland Central Redevelopment

The Canelands Central Redeveoplment project was managed by Bovis Lend Lease and saw the extension of the existing Shopping Centre and construction of a multi-storey car park. Vassallo Constructions was contracted to build the base level of the car park under the multi-storey car park and external roadworks. The centre continued to trade during the […]

Road Widening Project at Ayr

The project is located on the Bruce Highway between Giru and Ayr. The contract required just over one kilometre of roadway to be widened and strengthened by in-situ stabilising the existing pavement. Additional works included profiling four existing bridges and installing deep lift asphalt at bridge approaches, along with the installation of a one metre […]

Mackay Bucasia Road Duplication

This projects scope involved the duplication of 3.6 kilometres of Mackay Bucasia Road.  It was imperative that traffic interruption was kept to a minimum due to the large amount of commuters that use the road each day. Special work included constructing an overpass over the existing rail line, duplication of the existing road to make […]

Evans Avenue Rehabilitation

Evans Avenue is a busy thoroughfare and small business precinct.  The project consisted of full width road rehabilitation whilst maintaining traffic flow in both directions and retaining access to the local businesses.   Vassallo Constructions in conjunction with Mackay Regional Council undertook extensive liaison with stakeholders to ensure disruption was minimised. To reduce the impact, stabilisation […]

Paradise and Archibald Street Intersection

Archibald Street is one of the two main access points in to the Paget Industrial Area and is a designated B-Double truck route. It services a large volume of the precinct traffic both day and night.  Vassallo’s approach to traffic management was crucial to the successful delivery of the project. An innovative “peanut shaped roundabout” […]

Bridge Rd – Paradise St Intersection

The Parkside Shopping Precinct moved works along for Bridge Road and Paradise Street intersection.  Due to the expected increase in traffic with the new shopping precinct a redesign of surrounding roads was carried out.  One roundabout was removed and replaced with two new sets of traffic lights to ease the burden on the traffic flow.  […]

Kippen Street Beach Outlet

The Kippen Street Beach Outlet project is located in a Coastal Management District and needed special planning as it is predisposed to tidal influx. An outlet drainage was constructed within the Shellgrit Creek catchment in East Mackay. This will assist in preventing future flooding and minimise the risk of a storm surge event impacting properties. […]

Northern Beaches Shared Pathways

The Willetts Road and Sams Road intersection of Mackay services The Mater Hospital, Day Surgery, a Child Care Centre and a number of specialty stores. The Shared Pathway project included installing foot and bike paths, pedestrian handrails and upgrading the associated roads. Community liaison was carried out throughout the project to ensure business access was […]