The project is located on the Bruce Highway between Giru and Ayr. The contract required just over one kilometre of roadway to be widened and strengthened by in-situ stabilising the existing pavement. Additional works included profiling four existing bridges and installing deep lift asphalt at bridge approaches, along with the installation of a one metre […]