Midge Point Beach Project

A large section of the Midge Point Beach was destroyed during the 2017 Severe Tropical Cyclone Debbie. After an extensive review and design, Vassallo Constructions was awarded the contract to install and geotextile sand bag seawall on the beach to protect the beach from future damage. The project involves the supply of sand, filling and […]

A large section of the Midge Point Beach was destroyed during the 2017 Severe Tropical Cyclone Debbie.

After an extensive review and design, Vassallo Constructions was awarded the contract to install and geotextile sand bag seawall on the beach to protect the beach from future damage.

The project involves the supply of sand, filling and placement of approximately 2000x 2.5m3 sand bags. The project was completed in February 2019.