Vassallo Constructions carried out upgrade works to the Bucasia Beach Shared Pathway. Works included over 260m of bike and footpaths and an upgrade to the existing Beach Access Area. Bike racks and seating were installed along with minor drainage works. The site location required environmental management to ensure the sensitive area was protected during construction. […]