• Client: Mackay Regional Council
  • Category: Civil Construction
  • Capabilities: Earthworks, Environmental

Pioneer River Levee

Scope – Rock bank protection;– Installation of Steel wire gabion basket wall– Supply and installation of concrete pipe culvert components including end structures, aprons, field inlet pits, grout rock pitching etc;– Supply and installation of uPVC and polypropylene stormwater pipes, flood gates, stormwater pits etc;– Subsoil drain outlet including headwall, flood flap and rip rap […]

Scope

– Rock bank protection;
– Installation of Steel wire gabion basket wall
– Supply and installation of concrete pipe culvert components including end structures, aprons, field inlet pits, grout rock pitching etc;
– Supply and installation of uPVC and polypropylene stormwater pipes, flood gates, stormwater pits etc;
– Subsoil drain outlet including headwall, flood flap and rip rap protection;
– Supply and installation of the flood gate including associated footings;
 -Reinforced concrete blockwork walls including reinforced concrete footings;
– Design and fabricate and install flood stairs over levee wall.
– Construction of embankment using imported material;
– Construction of levees, catch banks and diversion blocks using clay fill materials;
– Backfill with selected backfill material to individual excavation;
– Demolition works;

Overview

The proposed Pioneer River levee is a flood protection levee envisaged to protect the communities along Fursden Creek including Valetta Gardens, Rivers Edge Estate and existing residential dwellings along the riverside of Kay Court and Heaths Road.

The levee design consists of a mixture of earthen banks and constructed walls. The proposed levee will stretch about 450m along the length of a constructed stormwater drain that runs between Fursden Court and Valletta Gardens, then about 1,400m to the east along the upper northern bank of Fursden Creek, where it merges with the Pioneer River.